State University of New York at Oneonta

Project Description

Upgrade of the Central Heating Plant

The Upgrade of the Central Heating Plant at SUNY consisted of the replacement of the existing Boiler No. 8 with a new 52,000 PPH high pressure steam packaged water tube boiler, modifying Boilers No. 4 & 5, installing new stacks, demolition of existing 336,000 gallon above ground fuel oil storage tank and five existing 25,000 gallon underground fuel oil storage tanks along with the installation of two 30,000 gallon underground storage tank. All State also demolished and reconstructed a new control room.