Beginning in 1973 primarily as a Mechanical Contractor in CT, All State's team of licensed, experienced professionals has provided consistent successful service ensuring long-term client relationships. For almost 45 years, All State Construction, Inc. has provided superior service in CT and throughout the Northeast. Whether you own a commercial or industrial building, whether you need installation or service, our goal is to provide you with mechanical systems expertise. We are holders of the "U". "S", "H", and "R" stamps.
Our Mechanical Contractors specialize in the following services:
- Power Generation
- Automated Temperature Controls
- Heating
- Cooling
- HVAC
- Process Piping
- Underground Piping
- Fuel Tanks
- Boiler & Burners
- Refrigeration
- Complete Power Plant Service
- Retubing Boilers & Exchangers
- Condensing Units
- Hydronic & Steam Piping Systems
- Mechanical Insulation
- Exhaust Fans & Hoods
- Chillers/Cooling Towers
- Air Outlets
- Air Handlers
- Adjusting/Balancing/Testing
- Rigging
- Pumps/VFDs
If you are looking for a leading Mechanical Contractor in CT & The Northeast, Contact All State Construction, Inc today.
Related Projects
University of Connecticut
Cooling Tower Replacement at Gampel Pavilion
Gampel Pavilion Demolition of existing Cooling Towers, installation of temporary cooling system during construction phase and installation of two (2) new 400 ton induced draft, cross-flow Cooling Towers including replacement of condenser water pumps, all piping and new control panels.
Click thumbnails to view larger images.
Westfiled Trumbull Mall
Emergency Smoke Evacuation System
Click thumbnails to view larger images.
University of Connecticut
Chiller Replacement at Gampel Pavilion
Click thumbnails to view larger images.
University of Connecticut Health Center
Chiller Replacement
The Chiller Replacement Project at UCHC consisted of removing three 1,000 ton absorption chillers, pumps and equipment, piping and electrical and replacing with two new 2,000 ton centrifugal chillers, chilled water and condenser pumps, equipment and piping. All State furnished and installed the complete new HVAC system to serve the chiller plant.
Click thumbnails to view larger images.
Westpoint Academy, NY
Mechanical Contractor for the renovations of MacArthur Long Barracks
MACARTHUR LONG BARRACKS RENOVATION VIDEO
Click thumbnails to view larger images.
State of CT Military Department
Westbrook and Rockville Armories Heating System Replacement
Click thumbnails to view larger images.
Metropolitan District Commission
Heat Recovery Facility
Click thumbnails to view larger images.
Hartford Steam
Replacement of Chillers
Click thumbnails to view larger images.
Sacred Heart University
Mechanical Contractor for the new Residence Hall.
All State Construction provided all of the mechanical work for Bergoglio Hall, the new three-story 80,000-square-foot Residence Hall at Sacred Heart University, new home to over 200 sophomore students.
Click thumbnails to view larger images.
University of Connecticut Health Center
Boiler Replacement and DA Repairs
Click thumbnails to view larger images.
Rand Whitney Containerboard
Co Generator Heat Recovery System
Click thumbnails to view larger images.
Connecticut College
Central Heating Plant Upgrade Project
Connecticut College hired CT Mechanical Contractor All State Construction to perform a Central Heating Plant Upgrade Project. The project entailed installation of four new 12,070 PPH water tube boilers, pumps, piping, insulation, boiler breeching and stacks.
Click thumbnails to view larger images.
Town of Glastonbury
Chiller Replacement at the Smith Middle School
Click thumbnails to view larger images.
University of Connecticut
Main Campus Data Center Upgrade
The mission critical project consisted of complete renovations and upgrades to the main campus Data Center while maintaining service with no interruptions.
Click thumbnails to view larger images.
Synagro Woonsocket
Biosolids Cogeneration Facility Generating Systems
Click thumbnails to view larger images.
US Submarine Base
Power Plant Boiler Replacement
Building 29 Power Plant Boiler Replacement included the demolition of boiler 4 , its control panel, ID fan, FD fan, motor drive and main stack. All State Construction installed two new 1,200 HP low Nox Combination gas oil fired steam boiler, including economizers, draft fans, exterior stacks, deaerator, boiler feed pumps and piping connections to existing systems.
Click thumbnails to view larger images.
Foxwoods Resort & Casino
Chiller Replacement of the Main Food Court
Click thumbnails to view larger images.
Greater New Haven Water Pollution Authority
Waste Heat Boiler Rehabilitation
Click thumbnails to view larger images.
State University of New York
Upgrade of the Central Heating Plant
The Upgrade of the Central Heating Plant at SUNY consisted of the replacement of the existing Boiler No. 8 with a new 52,000 PPH high pressure steam packaged water tube boiler, modifying Boilers No. 4 & 5, installing new stacks, demolition of existing 336,000 gallon above ground fuel oil storage tank and five existing 25,000 gallon underground fuel oil storage tanks along with the installation of two 30,000 gallon underground storage tank. All State also demolished and reconstructed a new control room.
Click thumbnails to view larger images.
State University of New York
East Campus Boiler Replacement
Click thumbnails to view larger images.
Central Connecticut State University
Cooling Tower Replacement