Project Galleries
Civil Construction
UCONN STORRS HOUSE WALL
This project consists of the repair of an existing wall to reduce the long term maintenance of the concrete retaining walls in front of the Storrs House located on the Storrs Campus of the University of Connecticut. All State Construction was the General Contractor for the removal of sidewalks and portions of concrete retaining wall and steps, general site demolition, grading and planting and new construction of metal railings and stone veneer cap.
Click thumbnails to view larger images.
UCONN AVERY POINT IMPROVEMENTS
The project consists of ALL STATE CONSTRUCTION installing a new granite stair and ramp system at the existing retaining wall on the south end of the Avery Point campus. Additionally, new sidewalks, landscaping, storm drainage and miscellaneous electrical and security work for site lighting were included.
Click thumbnails to view larger images.
Choate School Rosemary Hall
St John Hall Student Center
Demolition of existing buildings and new construction of 46,000 square foot, three story St John Hall Student Center at the Choate School.
Click thumbnails to view larger images.
State University of New York, Purchase, NY
Rehabilitate Utilidor, Phase I
All State Construction demolished and removed 5,600 feet of piping in existing box tunnel and furnished and replaced the 8" piping and supports plus 120 feet of 8" direct-buried, triple-wall piping. Expansion joints and hard-piped expansion loops in Utilidors were also furnished and installed.
Click thumbnails to view larger images.
Cheesecake Factory
Grease Trap Installation
The project required All State to remove and dispose of existing curbing and paved areas in order to excavate, furnish and install new piping for grease trap and sanitary sewer and install new concrete encased sewer pipes at water line adjacent to sewer. Excavate, place and install new grease trap per specifications.
Click thumbnails to view larger images.
University of Connecticut
Farmland Mitigation
Click thumbnails to view larger images.
University of Connecticut
The Project consists of removing approximately 25000 sq. ft. of broken up bituminous and 280 l.f. of curbing from the lower left section of D Lot on the Storrs Campus and prep the area for paving.
Click thumbnails to view larger images.