TOTAL MORTGAGE ARENA

Project Description

All State Construction completely replaced the existing rooftop mounted air handling/dehumidification equipment serving the arena and concourse as well as replaced the existing rooftop mounted chillers.  Associated work involved in this project was pump replacements, piping, modifications, structural support modifications, ductwork, controls, electrical power, start-up commissions and other work to deliver a complete and operational system. All State cordinated all new equipment storage, rigging and disposal of removed equipment. Conversion of both the existing Chilled Water and Heating Hot Water systems from straight water to a glycol/water mixture for freeze protection was performed. Limited fire alarm work associated with the installation of the new air handling units for the arena and concourse was coordinated, in preparation for integration with the updated building smoke control system. 

 