With experience in installing hundreds of miles of underground utilities for a number of Suffolk clients, it's no wonder All State Construction has become the number one installer of direct buried piping systems in the Northeast. Underground Utility services in Suffolk include the following:
St John Hall Student Center
Demolition of existing buildings and new construction of 46,000 square foot, three story St John Hall Student Center at the Choate School.
Click thumbnails to view larger images.
Medium Temperature Hot Water Pipe Installation
Click thumbnails to view larger images.
Underground Hot Water Distribution Piping
Click thumbnails to view larger images.
The project consists of all labor, material and equipment necessary to excavate and remove Low Pressure Steam/Condensate Return direct buried conduits and install new LPS/CR direct buried conduits furnished by the contractor connecting the Pierpont/Cance Dormitories and perform demolition and installation of new piping within the STMH and each of the two dormitories basement LPS/CR systems. Reconstruction and restoration included new pavements, retaining walls and base, lawns, trees, painting.
Click thumbnails to view larger images.
Rehabilitate Utilidor, Phase I
All State Construction demolished and removed 5,600 feet of piping in existing box tunnel and furnished and replaced the 8" piping and supports plus 120 feet of 8" direct-buried, triple-wall piping. Expansion joints and hard-piped expansion loops in Utilidors were also furnished and installed.
Click thumbnails to view larger images.
Main Steamline Replacement
Click thumbnails to view larger images.
Grease Trap Installation
The project required All State to remove and dispose of existing curbing and paved areas in order to excavate, furnish and install new piping for grease trap and sanitary sewer and install new concrete encased sewer pipes at water line adjacent to sewer. Excavate, place and install new grease trap per specifications.
Click thumbnails to view larger images.
Mechanical Contractor for the new Residence Hall.
All State Construction provided all of the mechanical work for Bergoglio Hall, the new three-story 80,000-square-foot Residence Hall at Sacred Heart University, new home to over 200 sophomore students.
Click thumbnails to view larger images.
Underground Steamline & Vault Replacement
Click thumbnails to view larger images.
High Temperature Hot Water Line Replacement
All State Construction installed new HTHW piping and associated connections between existing vaults adjacent to Niejadlik Hall Heading to Mead Hall with Piping run into the Mechanical Room in the basement of Occum Hall. The Project also included installation of new concrete pavements, erosion controls and site restoration.
Click thumbnails to view larger images.
Site Utilities Upgrade
Click thumbnails to view larger images.
North Campus Underground Piping
Click thumbnails to view larger images.
Replace Site Steam & Chilled Water Piping
Click thumbnails to view larger images.
Chilled Water Pipe Replacement
Click thumbnails to view larger images.
Steam & Chilled Water Pipe Replacement
Click thumbnails to view larger images.